Architectural aluminum formwork is generally used in large-scale high-rise housing construction projects, so the installation of this piece is also a relatively large project. How to install the specific building aluminum formwork? What are the steps? What should we pay attention to when constructing aluminum formwork? Let me introduce it to you right away.

No matter what the project is, the installation steps of architectural aluminum formwork are actually the same.

The first step is to measure the line, the second step is to install the wall column reinforcement-wall column hydropower construction, the third step is to install the wall column template, the fourth step is to install the beam template, the fifth step is to install the floor template, and the sixth step is to install the wall column template. The first step is the hydropower construction of the floor slab, the seventh step is the installation of floor reinforcement, the eighth step is finishing strengthening and inspection, the ninth step is the concrete pouring, the tenth step is the column wall concrete maintenance, and the last is the demoulding.


Install the aluminum formwork


So what should be paid attention to during the construction of building aluminum formwork? Summarized as follows:

Matters needing attention 1. The construction of aluminum formwork can add more integrally formed concrete components to the exterior walls and interiors, resulting in greater changes in the rigidity of the building structure. Therefore, the influence of these added concrete components should be fully considered in the structural design, and the increased rigidity of the external wall can be used, and the increased indoor load should also be included to make the force more reasonable.

Note 2: The wall surface of the construction aluminum formwork is too smooth, which will easily cause the hidden danger of the internal and external wall tiling and the insulation layer. Therefore, during the construction, attention should be paid to in-depth research on the release agent and wall tile adhesive. Particularly, the walls with internal and external thermal insulation need to be prepared for local swaying and anti-falling measures.

Note 3: The change in the section of the upper shear wall of the building exposes the disadvantage of insufficient flexibility of the architectural aluminum formwork. Therefore, in the design of the architectural aluminum formwork, the matching of standard parts and non-standard parts should be more rationally optimized. On the other hand, It is also necessary to improve the standardization of the main design to improve construction efficiency.

Copyright © 2020 KITSEN Scaffold&Formwork Official All Rights Reserved.粤ICP备20064098号

XML

leave a message

Get A free Quote

    *Your 100% privacy will be safe with us

   

the professional team to service !