内页banner
Contact us
  • KITSEN Formwork and Scaffolding Technology Co.,Ltd., Fengwei Shan, Beiguan Town, Yangjiang, Guangdong, China.

  • zip code :

    529932
  • phone :

    86-662-6698891,86-662-6699126
  • Fax :

    86-662-6698891
  • Email :

    info@kitsen.com
Products

loading images
Decking Beam Formwork

Decking Beam Formwork

  • Payment :

    T/T 30% deposit payment before manufacture, and 70% balanced payment against B/L Copy.
  • original region :

    China
  • port of dispatch :

    Shenzhen,China
  • min order :

    One Container
  • Easy and quick erect/dismantle decking beam formwork system is a simple and versatile soffit formwork system,

inquiry now
description


1. Product Description: 

KITSEN decking beam formwork system is a simple and versatile soffit formwork system, which is designed around contractors’ needs and using early stripping technology to ensure cost effective solution.


2. Product Parameters:

Product Name: KITSEN Decking Beam Formwork

Material: Aluminum Alloy 6061-T6, Plywood,Steel

Specification(mm)of Panel: 600×1800mm/900×1800mm (various size for selecting)

600×1800mm/900×1800mm

Basic Components: legs/props, primary beam (+secondary beam) and panels/plywood

Main Fittings: Aluminum truss, tripod, horizontal brace and drophead.

Decking Formwork Height: No Restriction, Can be adjusted by changing the Prop


3. Product Details:







4. Advantages:

1) Light Weight

-Aluminum profile makes light weight. The biggest panel of 0.9×1.8m is 23.5kg

-Faster forming of slabs due to the large panel 0.9×1.8m with a 1.62 m2 forming area.

2) Low crane use

-Up to 300mm slab thickness.

-Easy and quick erect/dismantle, no loose fittings ,have only three basic components (prop+primary beam(+secondary beam)+Panel) 

3) Versatile for any requirements

-Two erection configurations can be choosing that meet various customer’s requirements.

-Panel and primary beam solution

-Primary beam and secondary beam solution


5. Product Assembly Description: 

1) Check that all components are on site, undamaged and that they are functioning correctly – (refer to Checklist and Quantity Schedules). Damaged or incorrect components shall not be used.

2) Make sure the panel is clean before assembly.

Handle panels with care during transit.  Avoid bumping and collision. Do not climb panels. Do not hit, pry and drop panels roughly when stripping. Assort and pile up panels properly. Handle panels with care.

3) Pay attention: Before assemble the decking formwork, you should ensure that the ground is smoothly. And during the assembly process, you should operate in accordance with safe operation procedures strictly.


Leave a Message

If You Have Any Questions Or Inquiries Please Call Us Or Email Us By Sending a Message.

Copyright © 2017 Kitsen Formwork And Scaffolding Technology Co.,Ltd. All Rights Reserved.

Sitemap XML

leave a message

KITSEN

   

the professional team to service !